All new submittals and resubmittals must be submitted through the City’s Electronic Plan Check (EPC) system.
View Electronic Plan Check (EPC) details
For a complete list of services, please visit our online services page.
Plan review is the first step of the permitting process. Whether the project is a homeowner converting a garage or a developer constructing a high rise, the plan review team reviews each project for safety. As part of the plan review, staff checks property line setbacks and height requirements.
Plans must be clear and drawn to scale in order to show code compliance. An owner, architect, engineer, draftsperson, or designer may prepare plans. However, depending on the complexity of the project, a licensed California architect or engineer may be required to prepare the plans.
Frequently asked questions about the plan review process.
The process depends on the size of the project, whether it is a new project, a remodel, an addition, etc.
There are very few exceptions when plans are not required for commercial building projects; however, not all residential permit applications require plans.
View submittal requirements table for a basic outline of what is required for most residential permits.
Plan reviewers evaluate plans and supplemental files for minimum compliance with applicable Federal, State, and City codes, laws and ordinances.
Plans can be prepared and designed by an engineer or architect licensed by the State of California.
Depending on your project, it may be reviewed by other departments.
A permit is required to perform any work within the public right-of-way (usually a sidewalk, street, alley, or easement) or to use portions of a street for exclusive purposes per the City Code.
Generally, the conditions of approval for the project will indicate if off-site improvements are necessary. Depending on the scope of work, the required off-site improvements may require a minor encroachment permit or a major encroachment permit. Building projects submitted for building plan review which also require any off-site improvements must submit an Encroachment Permit to Development Engineering no later than by the cycle 2 review of the building plan check resubmittal to continue with building plan review. Email DE@cityofsacramento.org for any questions regarding the Encroachment Permit process which aren’t covered on the City web page.