Residential Fee Schedule

Residential Fee Information – July 1, 2024 to January 21, 2025

Call (916) 808-7890 for Department of Utilities development-related fee questions.

Fees are subject to change on every July 1st or at any time.

For current fees visit the City's Fee and Charge Database

Plan Check Fee

Full Cost Recovery = $205 per hour

Erosion & Sediment Control (ESC) Fee

Single-family residence =  $70.00

Residential Construction Water-use Fee

$201.00

Water Development Fee*

Domestic and irrigation water services:

Meter SizeFee Amount
¾″ meter$4,895.50
1″ meter$6,195.89
1 ¼″ meter$9,218.01
1 ½″ meter$12,207.38
2″ meter$22,194.76

*Water Development Fee credit is given for existing water service connections.

Water Service Installation Fee

Service sizes larger than 1.5” are offered only under special circumstances, and if approved a fee quote will be provided.

SizeEasement Tap*+Meter**
1"$2,208.00+$723.00
1.5"$2,549.00+$1,040.00

*Contractor excavates and exposes the water main for the City to install tap, corporation stop, water pipe from main to point of service and meter box. Contractor backfills trench and restores pavement. Incidentals work such as encroachment permit, traffic control is the Contractor’s responsibility

** City removes idler, provides and installs meter. If no meter box exists Contractor is responsible for providing and installing the box and all associated fittings per City Standard Detail W-402.

Water Service Abandonment Fee

1" to 3" = $2,005.00

Water Service Kill Tap*

¾” to 2" = $274.00

*Charged with every residential demolition permit, City crews will cut service on customer side of curb stop.

Water Service Relocation = $6,485.00*

*Only for 1” landlocked services, includes abandonment of existing service and installation of new full-service tap, and meter. Applicant is responsible for obtaining any required easements and for routing their service to the new meter box location

Drainage Development Fee

~

Drainage Basin TypeFee Amount
Combined Sewer Service Area$1.37 per sq. ft. of increased imperviousness (Offset by Combined Sewer Service Area Sewer Development Fee)
Pumped Basin*$0.06 per sq. ft. of increased imperviousness
Gravity Basin*$0.04 per sq. ft. of increased imperviousness

*Applies to areas of the Combined Sewer System with separated City drainage basins.

Sewer Development Fee (Either A or B)

  • Combined Sewer Service Area (Single-family residence) = $2,066.46
  • Sewer Development Fee Service Area (Single Family Residence) = $902.63

Sewer Service Installation Fee

4" EASEMENT TAP* = $1,781.00

*Contractor excavates and exposes the sewer line for the City to install a sewer tap. Contractor then installs sewer service connection from main line to the point of service, backfills trench and restores pavement. Incidentals work such as encroachment permit, traffic control is the Contractor’s responsibility

County Sewer contact information

Sacramento Area Sewer District (SASD)

10060 Goethe Road, Sacramento, CA 95827

Administration – (916) 876-6000

Permit Services – (916) 876-6100