The City of Sacramento, in cooperation with the California Department of Transportation (Caltrans), is evaluating improvements at the Interstate 5/Richards Boulevard interchange. The objective of the project is to provide long-term operational and circulation improvements to address future impacts resulting from high density development in the Central City. Project environmental studies began in September 2020 with the Project Approval and Environmental Document (PA&ED) phase scheduled to be completed in 2024.
The Richards Boulevard I-5 Interchange provides primary access to the Railyards and River District redevelopment areas from Interstate 5. Full build-out of these locations will add numerous residences and businesses, resulting in a substantial increase of traffic in the area. Operation of the Richards Boulevard I-5 interchange ramps is currently deficient as indicated by lengthy traffic queues onto mainline Interstate 5 and Richards Boulevard during peak hours. The situation will continue to degrade as redevelopment occurs in the area unless improvements are made to the interchange.
The objectives of the project are to:
The project is funded with a combination of Federal grants and Measure A funding.
Winter 2024: Circulate Draft Environmental Document for public review