Residential Remodel

A Residential Remodel activity encompasses a very large array of projects. The scope of some residential remodels includes work that falls under the “Minor Permit” category. In general, the scope must be considered non-structural to be considered a minor remodel permit. Non-structural remodels do not involve the removal or erection of any walls or the creation of, or enlargement of openings in any walls. Plans are usually necessary so that load bearing and non-load bearing status of walls can be verified. For the preceding reasons, Residential Remodel permits involve the reconfiguration of existing residential spaces to a degree that requires plan review.

The Residential Remodel activity type is also used in the rare instance that a commercial structure is being remodeled for use as a Single Family Residence, Duplex, or Halfplex where new square footage is not being created as part of the project.

Due on all residential remodel permits

Fees and taxes required for residential remodel permits

Building permit fee (inspection & intake)

View building permit fee (inspection & intake) details

Green building fee

View green building fee details

Plan review fee

View plan view fee details

Strong motion fee

View strong motion fee details

Due in some circumstances on residential remodel permits

Fees and taxes due in some circumstances on residential remodel permits, including requirement details

City operations tax

Only charged if a California licensed contractor is the permit holder.

View city operations tax details

Combined sewer fee

If the project is located within the City’s Combined Sewer system fees are calculated by the number of dwelling units. If a remodel results in the creation of a new dwelling unit additional Combined Sewer fees may be due. The Utilities department should calculate and assess the appropriate fee. Projects which pay this fee do not pay the Sewer Development fee, or the County SASD fee.

View combined sewer fee details

Construction debris fee

Charged if the project value is $250,000 or more or has a scope of work covered by the California Green Building Code.

View construction debris fee details

Downtown, River District, and Railyards impact fee

Due if the project falls in the Downtown, Railyards or River District areas, and will result in the creation of additional dwelling units. This fee should be assessed by the Public Finance section.

For more information, email NotifyPIF@cityofsacramento.org

Fire Department inspection fee

If a Residential remodel activity is used for the permitting of the conversion of a garage or storage building into a Residential Dwelling unit the project should be targeted to Fire for review and this fee may be charged by the Fire Department.

View Fire Department inspection fee details

Fire Department plan review fee

If a Residential remodel activity is used for the permitting of the conversion of a garage or storage building into a Residential Dwelling unit the project should be targeted to Fire for review and this fee may be charged by the Fire Department.

View Fire Department plan review fee details

Fire Department administrative fee

This fee is exclusively calculated and assessed by the Fire Department. If a project is targeted to Fire for review this fee will likely be charged.

View Fire Department administrative fee details

Housing impact fee

Charged on new residential units as established in the Mixed Income Housing Ordinance (City Code 17.712)

View housing impact fee details

Jacinto Creek fees

This fee would only be due if the proposed project included the creation of a new dwelling unit and the project is located within the Jacinto Creek area. Calculation, assessing, and invoicing of this fee is the responsibility of the Department of Public Works per city code section 18.28.100.

View Jacinto Creek fee details

Park impact fee

This fee is due if the project will result in the establishment of a new dwelling unit.

View park impact fee details

Plan review – expedite (building division)

Charged when expedited plan review services are requested and provided by the city. This is an optional service.

View plan review – expedite (building division) details

Planning division, expedited plan review fee

Charged when expedited planning plan review services are requested and provided by the Planning Division. This is an optional service.

For more information email planning@cityofsacramento.org

Planning division, inspection fee

Changed when the Planning Division performs field inspections

View planning division, inspection fee details

Planning division, mitigation monitoring fee

Charged on building permits for which field inspections are performed by the Planning Division regarding a mitigated environmental Entitlement requiring a monitoring plan.

View planning division, mitigation monitoring fee details

Planning division, plan review fee

Charged on building permits which require plan review by the Planning Division. This fee is based on project valuation.

View building permit planning review fee details

For more information, email planning@cityofsacramento.org

Public works fee

This fee is calculated by Public Works Staff in the Development Engineering section. The fee is a function of the number of plan review hours expended reviewing the project. Residential Remodel activities would only be targeted to Development Engineering if the scope of the purposed remodel would change how the existing parcel interacts with the public way (e.g. relocation of the driveway or addition of a driveway).

View public works fee details

Regional sanitation

A Residential Remodel permit could owe Regional Sanitation fees if the new development will result in greater sanitation flow. An example would be the remodel of an existing garage into a Single Family Dwelling unit. Especially on infill lots, Regional Sanitation should be consulted to determine the appropriate fee.

Regional Sanitation Fee Field Display:

  • County CSD-1 = Regional sanitation Fee paid at County no sewer fees paid to the city.
  • Combined = Regional Sanitation Fee and Combined Sewer fee paid at the city.
  • City or Basin = Regional Sanitation Fee and Sewer Development fee paid at the city.

View regional sanitation details

Residential construction tax

This is not charged in general on rehabilitation or remodeling of existing dwelling units. In the event that a structure is being remodeled into use as a dwelling unit then this fee would be charged.

Residential construction tax details

Sewer development fee

Projects located in the City Sewer Service Area requiring a new tap pay based on the size of the required service. If an existing tap needs to be enlarged fees could also be due. Projects which pay this fee do not pay the Combined Sewer fee or the County CSD-1 fee.

View sewer development fee details

Sacramento Area Flood Control Agency Development Impact Fee (SAFCA-DIF)

Due on all conditioned (air conditioned or heated) square footage added to the first and/or second floors of residential structures designated to be in the SAFCA-DIF area. Basements are exempt. Conversion of existing square footage to damageable square footage (most likely scenario triggering this fee under a residential remodel permit is the conversion of previously commercial second story square foot to residential dwelling square footage).

View Sacramento Area Flood Control Agency Development Impact Fee (SAFCA-DIF) details

Sacramento Area sewer district

If the property is in SASD, the sewer fees must be paid at the Regional Sanitation District offices. If this fee is paid, the Combined Sewer fee and the Sewer Development fee are not due.

View Sacramento Area sewer district details

Sacramento Transportation Authority (STA) fee

Due on projects which establish a new residential dwelling unit paid per unit established.

View Sacramento Transportation Authority (STA) fee details

Sacramento Transportation Authority administration fee

Charged whenever CDD charges the STA fee. 2% of the STA fee.

View Sacramento Transportation Authority administration fee details

School impact fees

Paid directly to the school district the project is located within. Fee due on additions greater than 500 sq. ft. See the school impact fee detail for more on calculating the increased square footage if the project involves removal and addition of square footage. For a residential remodel conversion of garage or storage space to habitable (related to spaces >500 sq. ft. would trigger fees).

Proof of payment must be presented prior to permit issuance.

View school impact fee details

South Natomas FBA fee

If the projects falls within the South Natomas FBA area, and the addition will result in an additional dwelling unit this fee may be due.

For more information email NotifyPIF@cityofsacramento.org

Transportation Development Impact Fee (TDIF)

Charged when the project results in the creation of a new dwelling unit.

View Transportation Development Impact Fee (TDIF) details

Utilities fee

This fee is calculated by Utilities Department Staff in the Utilities Development Services section. The fee is a function of the number of plan review hours expended reviewing the project.

View utilities fee details

Utilities fee – expedited plan review

This is an optional fee for Over the Counter or Expedited Plan Review performed by the Department of Utilities on building permit applications.

View utilities fee – expedited plan review details details

Water development fee

This fee is charged on any project which requires a new water tap or increases the size of an existing tap. The fees are based on tap size. In the event that a Residential addition involves increasing the water tap this fee should we calculated by the Utilities Department.

View water development fee details

Water meter fee

If the project scope necessitates an increase to the water service size a meter will be required. The Utilities Department is responsible for calculation of this fee.

View water meter fee details

Water supply test/analysis

This fee may be assessed as needed by the Utilities Department staff, or the Fire Department staff. It can be needed for several reasons. In all cases the Utilities Department staff is responsible for assessment and invoicing.

View water supply test/analysis details

65th Street fee

Due if the project falls within the 65th St area and the project results in the creation of a new dwelling unit. This fee is assessed by Public Works.

For more information, email NotifyPIF@cityofsacramento.org